This is the lower level work out room (closet)
6.26.2009
Hot-Hot-Hot!
Finally after weeks of waiting- we have power! The AC is cranked and ready to go.
This is the lower level work out room (closet)
The bistro is taking shape, the concrete is poured and we're ready to put stone on the fireplace
This is the lower level work out room (closet)
6.19.2009
6.12.2009
6.05.2009
6.01.2009
Happy June!
Subscribe to:
Comments (Atom)
